Minimise cost, Maximise Efficiency

A Balance between minimising costs while maximising construction methods, providing cost savings to the customer through time saving delivery.

MPB’s directors are constantly investing and developing in technology to deliver faster safer construction methods.
Slipform systems enable MPB to apply this method to structures that vary in design and complexity, tapered profiles, openings, embedment’s and wall thickness reduction are all achievable. Slipforming is a fast construction method for constructing Vertical structures achieving between 2.5M – 3M per day.