This project involved the installation of three footbridges and 2000m of new footpath to four existing uncontrolled pedestrian level crossings as part of the Evergreen 3 upgrade of the Chiltern Mainlines.
The works comprised of:
• Access provision to all sites including significant ground clearance and 1000m of aluminum trackway
• Liaison with land owners both for access to construct the footbridges and diversions to permanent rights of way
• Installation of piled substructures at all sites
• Fabrication and installation of three LM type footbridges (two with stairs and landings)
Chiltern Mainline
Network Rail
£2.3m
Rail
Footbridge renewal